Kitchen cabinet lead times and fitting schedule

Stock flat-pack units arrive in 1 to 2 weeks, replacement doors take 2 to 4 weeks, made-to-order rigid shaker or handleless cabinets take 3 to 6 weeks, and bespoke solid timber in-frame runs take 6 to 10 weeks.

Factory turnaround weeks from final measure to delivery, and how an Irish cabinet installation unfolds day by day.

Free, no obligation. One local fitter prices it, not five.

  • 2–4 wksreplacement doors turnaround
  • 3–6 wksrigid shaker or handleless
  • 6–10 wksbespoke in-frame joinery
  • 3 to 5 daystypical rigid fitting on site
Bright white fitted shaker kitchen wall and base cabinets with integrated oven and drawer stack

Typical 5-day rigid cabinet fitting sequence

  1. Before Day 1: cleared, dry shell. Old units stripped out, first-fix plumbing wastes and Safe Electric cables positioned, walls plastered dry and base flooring down (or planned cleanly around plinth height).
  2. Day 1: laser datum and tall/base carcass setting. Fitter finds the highest point on the floor, sets the laser line around the room, anchors tall housings and levels all base boxes onto adjustable legs.
  3. Day 2: wall units, island anchoring and corner scribes. Wall cupboards hung onto heavy-duty steel brackets, island sole plates bolted down, and end panels plus wall filler strips scribed tight.
  4. Day 3: drawers, doors, internal pull-outs and appliances. Soft-close runners clicked home, doors hung, LeMans trays mounted and integrated oven/dishwasher housings lined up.
  5. Days 4–5: plinths, cornice, handles and final alignment. Laminate tops fitted (or stone fabricator templates once base boxes are fixed), kickboards clipped in, every 2 mm door reveal tweaked level and workspace cleaned.

Price my cabinets

Four quick taps and our cabinetry guide shows before we ask for a phone number. One local fitter rings you, not five.

Shaker kitchen cabinets, a 5 to 7 m run, supplied and fitted: €5,200 to €9,500 (cabinets & hardware).

Step 1 of 5

What type of cabinets?

Pick the closest style. The fitter checks sizes and finish samples on site.

How the cabinetry figure is worked out

The guide reflects typical Irish cabinetry prices for 18 mm factory-assembled rigid carcasses, doors, soft-close concealed hinges, drawer boxes, plinths and end panels. Supply-and-fit totals include cabinet installation into a cleared kitchen shell; stone or quartz worktops, appliances, plumbing alterations and electrical rewiring are priced separately. Replacement door ranges assume existing carcasses are level and dry. Ask whether VAT sits at 13.5% or 23% under the two-thirds rule. Only a fitter who measures the room gives a firm written quote.

Timing a stone worktop template cleanly

If you are pairing new cabinetry with quartz or granite tops, stone fabricators cannot laser-template until every base carcass, end gable and island block is permanently screwed and levelled. That leaves a typical 7 to 14 day gap between cabinet fitting and stone drop-in, during which fitters often lay temporary chipboard offcuts over the sink unit so you keep running water.

Scheduling questions

How long does fitting replacement doors only take?

Replacing 12 to 16 doors, soft-close hinges, handles and plinths normally takes 1 to 2 days with your sink, hob and worktop staying connected throughout.

Should kitchen flooring go down before or after cabinets?

Tiled floors generally run right across the room before cabinets sit on top (making dishwasher removal easier). Floating laminate or engineered wood should stop just behind the plinth clips so heavy units never pin the expanding floor.

When do I pay the deposit on made-to-order rigid cabinets?

Most Irish makers take a 30% to 50% manufacturing deposit after final site measurement, a stage payment on delivery, and the final balance once doors and hardware are aligned.

What delays kitchen cabinet delivery most often?

Custom paint-to-order colour batches, non-standard height doors, waiting for confirmed appliance model numbers before carcass cut-outs, and late November pre-Christmas workshop queues.

Every cabinetry guide on this site

Bright white fitted shaker kitchen wall and base cabinets with integrated oven and drawer stack

Check current workshop lead times in your county

Complete four quick steps in the planner and confirm exact lead weeks with one local cabinet fitter.